Loft insulation, cavity walls, mould and damp, painting and EPC improvements across Luton and Bedfordshire 020 8090 9481 WhatsApp 07456 394024 info@ecobuild-contractors.co.uk
270mmrecommended depth of mineral wool loft insulationSource: Energy Saving Trust
About 25%of heat lost through the roof of an uninsulated homeSource: Energy Saving Trust
40 yearstypical lifetime of loft insulationSource: Energy Saving Trust
Loft & Insulation

Loft Insulation & Boarding with EcoBuild Contractors

Most lofts we survey have one of two problems: too little insulation, or a storage floor screwed straight onto the joists that has flattened whatever was underneath. Our loft insulation and boarding service deals with both in a single job. We clear out tired or damaged material, lay new mineral wool to a finished depth of approximately 270 to 300mm, and lift any storage floor clear of it on raised supports, so the roof keeps the heat in and still holds your belongings.

Lofts are the core of our work, from small terraces to large detached homes and commercial roof voids. Where the existing insulation is wet, dusty, fouled by pests or crushed flat, we bag it up inside the loft and take it away for disposal rather than burying it under a fresh layer. Where it is dry and still springy, we keep it and top it up, which saves time and material.

A finished loft needs more than rolls and boards. We can fit a loft ladder, enlarge a hatch that is too small to pass a box through, and add an insulated, draught-sealed hatch door. Because a well insulated loft runs colder, we also check the ventilation and keep the eaves open so condensation does not settle on the roof timbers. Some households may qualify for funding through government schemes; we can check whether yours might, but it is never guaranteed.

What we do

Loft insulation and boarding work we carry out

Old loft insulation removal and disposal

Damp, soiled, compressed or debris-filled insulation is bagged inside the loft, carried out through a sheeted route and taken away for disposal.

New loft insulation to 270 to 300mm

Mineral wool rolls laid in two layers, the first between the joists and the second across them, to a finished depth of approximately 270 to 300mm.

Loft insulation top-ups

Where the existing layer is dry and sound, we keep it and add a cross layer on top to bring the whole loft up to the recommended depth.

Raised loft boarding systems

Storage floors lifted above the finished insulation on raised supports, so you gain usable space without crushing the layer that keeps the house warm.

LoftZone StoreFloor and loft legs

StoreFloor uses engineered supports and beams for larger storage decks, while loft legs screw to the joists and suit smaller platforms and walkways.

Loft ladders and hatch enlargement

Folding or telescopic ladders fitted to the hatch, with openings enlarged or reframed where the existing one is too small to use safely.

Insulated, draught-sealed hatches

A hatch door with insulation bonded to the back and a seal around the frame, so warm, moist air from the landing stays out of the roof.

Loft ventilation and condensation prevention

Eaves kept clear with trays or spacers, and roof vents added where the survey shows the cold loft is not getting enough airflow.

Tank and pipe lagging

Cold water tanks and pipework in the loft are jacketed and lagged, because a properly insulated roof space gets much colder in winter.

Why it is worth it

Benefits of loft insulation & boarding

Warmer rooms upstairs

With a full depth of insulation over the ceiling, bedrooms and landings hold their warmth for longer and the heating has less to make up.

Storage without the heat loss

A raised floor keeps boxes and suitcases off the insulation, so the loft becomes useful space without undoing the work below it.

Safe, easy access

A fixed ladder and a hatch large enough to pass a box through replace the balancing act on a step ladder.

Helps your EPC rating

Loft insulation depth is recorded on an Energy Performance Certificate, so bringing it up to the recommended level can help the rating.

How thick should loft insulation be?

The Energy Saving Trust recommends 270mm of mineral wool in a loft, and we normally aim for a finished depth of approximately 270 to 300mm. Many lofts were insulated decades ago to a fraction of that, and older material slumps over time. If you can see the tops of the joists when you look across the loft, the depth is almost certainly short of the recommendation.

Depth only helps if the insulation is not crushed. Mineral wool works by trapping air between its fibres, so boards, boxes or a walkway pressed down on top cut its performance sharply. That is why we raise any storage floor above the finished insulation instead of fixing boards straight onto joists that, in many older homes, are not much deeper than the first layer.

Loft with thick mineral wool insulation laid between the joists

Should old loft insulation be removed or topped up?

Removing old loft insulation is not always necessary. Dry, clean mineral wool that has kept most of its thickness can stay where it is, with a new layer laid across the joists on top. That is the quicker and cheaper route, and it is what we recommend when the survey shows the existing layer is in fair condition.

Removal and replacement makes sense when the material is damp, mouldy, contaminated by rodent or bird droppings, heavily compressed, or mixed with rubble from past building work. It is also worth considering when the loft is being boarded, because the floor supports fit more neatly on clean joists. If we find anything that could be an older hazardous material, such as loose vermiculite, we stop and recommend it is tested before anyone disturbs it.

Installer laying rolls of mineral wool insulation across loft joists
Our process

How the job runs

  1. Free loft surveyWe measure the existing insulation and check its condition, then look at the joists, wiring, hatch, roof covering and ventilation and agree how much of the loft you want boarded.
  2. Clear-out and removalThe route to the hatch is protected with dust sheets, and any old insulation that needs to go is bagged in the loft and taken away.
  3. Insulate and raise the floorNew mineral wool goes down in two layers to around 270 to 300mm, then raised supports and boards are fixed above it over the storage area.
  4. Ladder, airflow and handoverAny ladder or new hatch is fitted, the eaves are checked for airflow, the tank and pipes are lagged, and we walk you round the finished loft.
FAQ

Loft Insulation & Boarding questions

How long does loft insulation and boarding take?

A typical house loft that needs a top-up and a boarded storage area is usually finished in one or two days. Removing old insulation first, or fitting a ladder and enlarged hatch, can add time, and we confirm the timescale after the survey.

Do I need to empty the loft before you start?

Yes, we need clear access to every joist to remove or lay insulation and fix the floor supports. If clearing it is a big job, we can arrange a loft clearance before the installation day.

Can I walk on loft insulation?

No. Mineral wool will not take your weight and the ceiling underneath is usually plasterboard, so a foot placed between the joists can go straight through it. A raised boarded area gives you a safe place to stand and store things.

Is mineral wool safe to have in my home?

Once it is laid above the ceiling it causes no problems. It can irritate skin and eyes while it is being handled, so our installers wear protective clothing and bag every offcut before they leave.

Could my loft insulation be funded?

Some households may qualify through government-backed energy schemes, depending on income, benefits and the property. We can check your details, but funding is only confirmed once the scheme approves it.

Free, no-obligation quote

Get a free quote for loft insulation & boarding

Tell us a little about your property and the work you need. Add a few photos if you can, it helps us give you an accurate price sooner.

Get your free quote

Choose the service you require

Up to 5 photos. We shrink them on your device before sending.

    We use your details only to reply about your quote. See our privacy policy.

    Related services

    Often booked with loft insulation & boarding

    Raised chipboard storage floor on supports above thick loft insulation

    Loft Boarding

    A raised storage floor on LoftZone StoreFloor or Loft Legs, fitted above full-depth insulation so the loft stays warm and becomes properly usable.

    Learn more
    Folding timber loft ladder lowered from an insulated ceiling hatch on a landing

    Loft Ladders & Hatches

    Aluminium, timber and telescopic loft ladders fitted with an insulated, draught-sealed hatch, and openings enlarged or moved where they need to be.

    Learn more
    Eaves ventilation trays fitted between rafters above loft insulation

    Loft Ventilation

    Felt lap, eaves, soffit and roof vents fitted to keep air moving through the roof space and stop condensation, mould and wet insulation.

    Learn more

    All loft & insulation solutions